SICV Brasil
Data stock: Default root data stock [ Download ]

Process data set overview page

Data set: Itaipu hydroelectric power plant (00.00.000)

Full name
Itaipu hydroelectric power plant
Location
BR
Reference year
1977
Valid until
2074
Reference flow(s)
Type
Unit process, black box
Parameterized?
no
LCIA results included?
no
Category
Itaipu
Synonyms
Use advice for data set
Data set use approval
General comment
The LCI covers all relevant process steps / technologies for the construction of an specific hydropower plant in Brazil. The inventory is based on data from interviews and power plant construction reports of Itaipu Binacional. The dam construction started in 1975, and finished during 1986. The first turbine began to operate some years earlier, in 1984. The current installed capacity of energy production of the overall system is 14.0 GW, which represented around 15% of the total installed capacity in Brazil (to notice that the energy produced is consumed in Brazil and in Paraguai). The estimate for the Itaipu average electricity production is 8.92E04 GWh/year, considering a 100 years life span.
LCI Method Principle
Other
LCI Method Approaches
No records found.
Completeness of product model
No statement
Reviews
No records found.
License and access conditions
Copyright
no
Access information
All information can be accessed by everybody.
Owner of data set
Technical purpose
Input Products
No records found.
Co-Products
No records found.
Data set version
00.00.000
Time stamp (last saved)
2015-05-26T13:38:52.784-03:00
Data set format
Compliance systems
No records found.
Tag
Registered in
Process is not registered in any registry
Data Set deregistration
Are you sure you want to deregister selected dataset?
Please enter the reason of deregistration and confirm.