SICV Brasil
Data stock: Default root data stock [ Download ]

Process data set overview page

Data set: Electricity from Tucuruí power plant, at power plant, 1 kWh (00.00.003)

Full name
Electricity from Tucuruí power plant, at power plant, 1 kWh
Location
BR
Reference year
1984
Valid until
2046
Reference flow(s)
Type
Unit process, black box
Parameterized?
no
LCIA results included?
no
Category
Tucuruí
Synonyms
Use advice for data set
Data set use approval
General comment
Additional remarks: Diesel consumption derived from flow diagram in Pires, A.C. (2012) 2012Z. The LCI covers all relevant process steps / technologies for the construction and operation of an specific hydropower plant in Brazil. The inventory is based on data from power plant construction reports of Eletronorte. The dam construction started in 1975. The first equipments were installed in 1984. New equipments were installed in 2010. The current installed capacity of energy production of the overall system is 8.37 GW, which represented around 10% of the total installed capacity in Brazil. The estimate for the Tucuruí average electricity production is 7.21E04 GWh/year, considering a 60 years life span, which was the time frame considered for LCI modeling purposes.
LCI Method Principle
Other
LCI Method Approaches
No records found.
Completeness of product model
No statement
Reviews
No records found.
License and access conditions
Copyright
no
Access information
All information can be accessed by everybody.
Owner of data set
Technical purpose
Input Products
No records found.
Co-Products
No records found.
Data set version
00.00.003
Time stamp (last saved)
2015-05-26T13:38:52.944-03:00
Data set format
Compliance systems
No records found.
Tag
Registered in
Process is not registered in any registry
Data Set deregistration
Are you sure you want to deregister selected dataset?
Please enter the reason of deregistration and confirm.